Friday, 7/18
8:07
-
The 10–01 one inlet was started early this morning.
- Can somebody shovel some dirt up under ditch 9 where it is missing so the ditch does not weaken?
-
Russell - Grass/weeds are already pretty thick at the property
-
Ortega's property - Cracks running along ditch nine between ditch 4 and 183rd Ave and cracks at the porthole cover.
10:48 AM
-
10-01 - Marco called - water flow is really high on ditch 9 right now - he is not going to be able to take all the water
- Marco's water hasn't even started yet (11am-1pm), but both his upstream neighbors have sent him water
- Walker said he doesn't want the water
- Soja couldn't take it
-
Russell
3:00 PM
- We have water coming down ditch 8 right now Friday @3pm. Water is not supposed to turn on until 4pm for 10-03.
- Resa has it going to her neighbors house
3:25 PM
- Water on the 10–1 inlet was adjusted at
- The problem, once again, had to due with construction on Northern.
- They had a pipe in ditch pulling water.
- MWD did not want to short us water so they let it flow as is until construction done for the day.
- The pipe was pulled and Chase adjusted water flow.
6:54 PM
- Russell - Active blow out. Gopher and onto driveway. They are FULL.
- Ken - He called and I told him to close ditch 9 and open ditch 4 to send water.
- Any excess water should be going to Victoria's property.
- Ken - He called and I told him to close ditch 9 and open ditch 4 to send water.
Saturday, 7/19
6:37 PM
-
If we are paying for weed spraying out here, they should probably return because they are not stopping. I would think it would be covered under a respray versus having to pay more money.
-
Saballa has some stuff coming off of his fence and throwing feeders down into ditch 9.
Sunday, 7/20
6:25 AM
- Opened and closed ditch 1 a couple of times as it does not appear to be sealing - did not see anything in the tracks.
Monday, 7/21
1:03 PM
- Resa - Collapsed and filled the gopher hole at the end of ditch 4 all the way to Walkers fence.
Tuesday, 7/22
2:53 PM
- Resa - Gopher hole on ditch 9 (behind LeBlanc) between ditch 7 & 8 is now filled in as well as a few smaller gopher holes along that path.
Wednesday, 7/23
9:17 AM
-
Inlet 10–3, ditch 9 east of ditch 7. Looks like more of the gopher tunneling and not far from the original area that was just fixed.
-
Inlet 10-3, ditch 9 going from ditch 7 to ditch 8. This section of the ditch also needs a re-spray of weeds.
Thursday, 7/24
7:20 AM
- Sanchez on ditch 8 did not have check in at 11:00pm. Tried to reach him but no response.
- Contacted Kutz who had forgotten to sign up and they took water from 11:00pm-2:00am.
3:29 PM
- Inlet 10-1, ditch 9. There is some really heavy cracking behind the John Gilbert residence, and to the west of it.
- This may be the area the water is getting through and then Terry Russell is noticing it coming up at a seam even before the water gets to his irrigation time.