Last Modified 7 months ago
Friday, 5/02
10:55 AM
- (Letter) Bandin ditch 9 overflows because they only have 1 port.
- I explained she needs to put in second port.
- Resa is taking her overflow.
- We should follow up with phone call to explain again and maybe meet with them.
- Same thing happened last week.
- She does have a 2nd port, but does not/ cannot use it.
- She needs a second useable port - all the water needs to go on her property.
- or to work with neighbor
- (Training) Resa - Trained Allard on 10-01 start
4:02 PM
- Nordstrom will do the ditch 7 -> 8 gate change, but is requesting training
- @Rene will train them on that gate change
Saturday, 5/03
9:41 AM
- Just verified both gates are running right at a 90 inch head
1:05 PM
-
The run is fluctuating I just measured it again and it is now running at about an 80 inch head on 10.1.
-
There are a couple ports open now that are not getting irrigation. I do not know if they aren't used or are just forgotten to get closed.
-
7327 0ne open port not currently scheduled to irrigate.
-
7101 two ports open not scheduled to irrigate
2:47 PM
- There is a concrete issue in ditch 9. It is breaking apart, just west of where repairs were made earlier.
- Sabala's place?
- Ditch one may have another concrete issue. It looks like a temporary repair may have been made, but it is cracking again.
- Ditch one gate change could use some grease - it’s hanging up and pretty hard to roll down.
- (Letter) Nolan - to get weeds under control in his section of ditch 9
- Could not walk on either side of the ditch and ended up walking down ditch nine
- (Letter) Romo - asking to cut the cactus back that is overhanging the walking path and going directly over ditch 9.
5:13 PM
- The gate is not sealing well on ditch 5.
Sunday, 5/04
8:31 AM
- The gate is closed on ditch 9 at ditch seven but there is still quite a bit of water moving through it.
- (Letter) Schneider - stuff coming out the back of his property and going down into the ditch
- Ditch 6 gate is not sealing 100% on that ditch and water will continue to move through it.
Monday, 5/05
3:40 PM
-
Crossover on ditch 9 and 181st cleaned (again?)
- The palm tree debris belongs to Fitchner's trees.
-
(Training) Rene - Trained Nordstrom on Ditch 7 to Ditch 8
-
(Training) Rene - Trained LeBlanc on Crossover @ Ditch 9 and 181st
-
(Letter) Bandin - or phone call to clean the stuff out of the ditch.
- All of these weeds and grass is growing like wildfire right now and will be plugging up the water flow.