Last Modified 8 months ago
Friday 4/11
10:00 AM
- MWD called about water on Glendale - said it was from 10-03
- 10-03 was running well - Ken checked in with Holmes - no water leaking.
- 10-01 outlet was leaking water onto Glendale before schedule was to start.
- Resa called MWD
- Ken put in checks at Victoria's port on ditch 4
7:20 AM
- Inlet 10–3, gate nine is open and five is closed.
- There are still weed issues down ditch nine looking east from 183rd Ave.
- The head of ditch 5 at 9 is in need of a repair.
- Mark saw that and is going to repair it.
Saturday 4/12
6:46 AM
- Dene was still getting water on D1 at 0630.
- He sent water down 9 (closed 1),
- Ryan was supposed to get it at 0530
- Jessica verified it was closed 7:32 AM
7:50 AM
- D2 D9 area needs dirt by ditch
8:42 AM
- Vandeman on ditch five blew out some berms.
- Water went to the next-door neighbor and is going down Orangewood
- They blew out the berm on the back of their property and the access road is flooded.
- Britt Callahan agrees - give them a call or send them a letter
2:02 PM
- Nunez - 7715 N 183rd leaked out the East side into Ditch 6.
- Don't see them signed up for water. Maybe it was excess from someone else?
- Jessica called and left a voicemail.
3:29 PM
- Spoke to Nunez.
- He needs 1 maybe 2 new port covers
- Mark Squires - Sunday at 2:05 PM - 2 port covers replaced
- He does not want water on his property but it leaks thru and he has tried to "rig" it but needs help.
- Molina does open a small channel in the back for him sometimes to share water but he said he has a sprinkler system and uses that 99% of the time.
- He said he will take responsibility and go fix gopher leaks, he has a small skid steer.
- His number needs to be updated
- D6 north of Orangewood needs repair.
- Nunez confirmed he will fix his berm and fix hole
- Jessica Tues 4/15 11:17 AM Nunez repaired his berm and the erosion on the ditch
5:45 PM
- Requests help with the gate change from 3 to 4
- Britt volunteered to help.
Sunday 4/13
6:36 PM
- Met with Dan Ryan on D2 for training. Showed him 10-1 and 10-3, showed him how gate changes are done, etc.
- He did gate change at D2, but was unclear about process.
- He should get credit for D1 to D2 change.
- Will give Britt the same credit for training.
Monday 4/14
5:37 PM
- Looking for anyone take water on ditch 4.
9:08 PM
- 2 properties south of Meduna on ditch 8 has heavy trees and shrub branches growing down in the ditch. Its excessive and should be addressed.
Tuesday 4/15
6:05 AM
- Water on Glendale probably from D4
2:58 PM
- Last irrigator on Ditch 4 2 files needs help with checks
3:35 PM
- Talked to him about his check and explained the different ways to prevent water from escaping.
- The water went east of 183rd on Glendale - redirected all of the tailings.
- Kevin believes someone else contributed to the water dump, but I can’t be 100 percent sure.
5:49 PM
- 10-1 running down ditch 2 and into a property.
Wednesday 4/16
12:43 PM
- Mark Squires got the end of ditch 3 all cleaned up and shoveled all the dirt and rocks out.